Cy
Tuesday, September 21, 2010
Studio Update August 17, 2010!
Glass installation, finishing works, and as you can see with the open wall, the tubing for the aircon is running inside it already.
Studio Update August 21, 2010
This day was electricals and connections day as you can see from the photos. This was a much awaited day for me and I can also say much delayed hehe I had to make sure everything was in place because everything here is a fixed install so it's not like I can change my mind later on and fix connections and such. The cabling ran through the walls and under the floor so it's pretty much FIXED! :o Anyway, it worked out fine and I'm glad that this day was over and done with :)
Cy
Studio Update August 20, 2010!
Took pictures of the Studio wall plate I designed. This was taken from a floor-type connector since I couldn't find those wall mounted ones. We just had to make do with what was available and use our heads to work around the limitations. Turned out ok as you can see :)
Cy
Studio Update August 10, 2010!
Here you can see the work area and the designer checking up on her work :)
Cy
RPG Metanoia
Been a while since I updated my blog.
So many things have happened the past few weeks I could hardly post anything. It's been really hectic. Anyway, the reason for that is for another entry. Here's my entry for RPG Metanoia's Teaser event held in On Stage in greenbelt 1.
As you can see in the photos, we have Jett Pangan with us since 2 songs of mine were chosen for the soundtrack of the movie. One of the songs will be performed and sung by Jett for the movie version. Of course the abum version's gonna be me. It was a great and fun experience and it is indeed an honor and privilege to be part of the 1st 3D animation Philippine-made full feature film! :)
Good times...
Cy
Subscribe to:
Posts (Atom)